Case Study

Cunard Building

Cunard Building

Location: Liverpool

Project Date: January 2010

Cunard Building

Our Brief

Cunard Building
Cunard Building

Our brief:

The scheme involved the refurbishment CAT A of an existing suite within the Cunard Building on the 3rd floor. Previously being involved in the fit out of common areas and other suites, it was imperative that the high standard of finish was maintained, as with all our jobs.

Jennor pride themselves on creating a high standard of finish on each and every job.

How we inspired:

The CAT A refurbishment to the 3rd floor demanded extremely careful management as the building housed existing tenants and shared services.

The project included for the installation of the M&E infrastructure, new raised access flooring, new ceilings, new power, lighting, fire alarm system, window overhaul and finishes complete.

The project was also M&E design and build, Jennor had to design the M&E systems to meet criteria and performance demands required by the client, CBRE.

The result:

The fourth floor has now been transformed into a state-of-the-art office space, ready for a new tenant.