Our Brief

4th Floor Castle Chambers - £700,000.00
4th Floor Castle Chambers - £700,000.00

Following on from a slight delay in getting the green-light to proceed with this prestigious ‘Fit-out’, Jennor UK were absolutely thrilled to eventually get instruction from CBRE/Wirral M.B.C. to fully transform this tired and dated 4th Floor plate within Castle Chambers for their incoming tenant DSG.

Working between ‘Live’ floors is always be a challenge, especially during standard office hours, but our forward planning and preventative measures to minimise ‘sound travel’ paid dividends as by completion of the project we didn’t receive a single complaint or negative utterance from anyone in the building!

 

Jennors’ works consisted of the following:-

 

•The construction of Blockwork walls to part-form new meeting rooms adjacent to the Reception area.
•Beautifully exposed Soffits to 70% of the Floor Space.
•Oversized fully Glazed featured Double Entrance Doors and Casings.
•Stunning off-set ‘L’-Shaped Glazed fronted bank of Managers Offices.
•Recessed square ‘Downlit’ LED lighting trough to the main Corridor support pillar.
•New M./F. Ceilings with integral spotlights to the Reception and front Meeting & Admin Offices.
•Full and comprehensive M. & E. Package featuring ‘Ovelo’ exposed galvanised ducting.
•The supply and installation of a beautiful featured Wall storage units spanning one end of the floor plate (shown above).
•The installation of featured Cable trays fitted with integral spotlights!
•New ‘break-out’ Kitchenette.
•The full installation of a Staff Diner, complete with 1950’s type Diner seating Booths, bespoke pendant lighting, state-of-the-art Cupboards, worktops and White-Goods.
•Teak wall panels to the Reception entrance (resplendent with the DSR Logo) & corridor broken up with laser blue entrance walls and flooring.
•Bespoke Illuminating (fully I.T. operational) Reception Desk c/w D.D.A. compatible.
•Bespoke Reception Backscreen with contrasting illuminated feature panel.
•Brand new Furniture throughout including sets for Offices, Meeting Rooms, Staff Diner and Reception.
•Full Floor Plate Decoration package.

The Result

 

As you can ascertain from the photographs within this ‘Case Study’, this was one of those projects that leave you speechless when comparing before and after images, we have serviced many projects within Castle Chambers over the years but for sheer quality of finish and workspace atmosphere, this one will take some beating.

Although we probably don’t need to relay our Clients thoughts, it would be remiss not to mention that CBRE, Wirral M.B.C. and indeed DSG. were all highly delighted with the result.