Jennor UK were tasked with the following works:-  

We commenced by completely gutting the two suites and the staff area separating the two rooms.

Installed new suspended ceilings throughout inc. new LED lighting panels and emergency fitments.

Supply and installed new Door Casings finished off with the supply and installation of solid core FD30 Fire Doors in a mixture of Hardwood & Paint Grade.

Installed new ‘Polysafe’ Standard PUR flooring throughout the whole of the classrooms following the laying of a new Latex Screed.

Large selection of new Kitchen Wall and Base Units complete with drainage sink basins throughout the suites.

New A/C System throughout, coupled with a state-of-the-art extraction system.

Repair and redecoration of existing Metal Window frames We punched a hole in the external wall to the second floor IT room to form a new external access doorway.

Supply and installation of all new White Goods i.e. Hobs & Ovens, and High backed Student Stools.

Installed a large amount of desktop PowerPoints.

Supplied and installed 5 No. tall fridge freezer ‘Blast Chillers’.

The installation of a new Window Blinds.

Installation of specialist 6 tiered Metal Shelving.

Final Decoration throughout the two suites and adjoining Staff area.

We also carried out a number of repairs to the roof (replaced 4 No. Cowl roof lights) area directly above these two newly remodelling rooms and installed a core drilled fixed galvanised steel handrail to the perimeter of this roof to accommodate the roof works and for future use.